Studio Engineering Studio Engineering
  home
  company
  resources
  field application
  recent projects
  reference list
  our clients
  client area
  site map

 

 

 

 

reference list

 
Ship Name Ship Type Owner Description of works, Date & Register

Repubblica di Pisa Car Carrier Grimaldi Group Classification Project and lenghtning in cylindric part
1988/89 RINA - ABS
Repubblica di Venezia Car Carrier Grimaldi Group
Repubblica di Genova Car Carrier Grimaldi Group
Repubblica di Amalfi Car Carrier Grimaldi Group
Repubblica di Roma Car Carrier Grimaldi Group

Ausonia Passenger Cruise Grimaldi Group Refitting in hotel and new bulb and new blades 1985 RINA Res. MSC.24(60) Solas upgrading

Splendid Passenger Ferry Grimaldi Group First body plan andmanagement of project 1989 RINA - ABS
Majestic Passenger Ferry Grimaldi Group

Fides Car Carrier Grimaldi Group First body plan andmanagement and survejor of project 1990 RINA - ABS
Spes Car Carrier Grimaldi Group

Repubblica Argentina Ro-Ro Cargo Grimaldi Group 3D Model steel structure and classification drawings 1998 RINA - ABS Final stability
Repubblica del Brasile Fincantieri Grimaldi Group

Victory Ro-Ro Passenger Ferry Grimaldi Group Superstructure modifications
Solas Conference updates
Res. MSC.24(60) Solas upgrading
Refurbishing 2002

Dora Baltea Car Carrier Grimaldi Group Antiracking calculationand works. 1987 RINA
Dora Riparia Car Carrier Grimaldi Group
 

Costa Marina Passenger Cruise Costa Crociere Complete ship design:basic design steeelworks and pipeworks drawings and shop documentation electrical and ventilation system, fire protection
construction survey
1988 RINA – ABS
Costa Allegra Passenger Cruise Costa Crociere

Enrico Costa Passenger Cruise Costa Crociere New Stability. 1989 RINA

Costa Riviera Passenger Cruise Costa Crociere Refurbishing
Res. MSC.24(60) Solas upgrading
Costa Playa Passenger Cruise Costa Crociere

Switzerland Passenger Cruise Prestige Refurbishing
Res. MSC.24(60) Solas upgrading

Adriana Passenger Cruise Prestige New Stability
Refurbishing
Res. MSC.24(60) Solas upgrading

Mermoz Passenger Cruise Costa Crociere New Stability
1994 Bureau Veritas

Silver Cloud Passenger Cruise V-Ship Complete ship design:Basic design steelworks and pipeworks drawings and shop documentation electrical and ventilation system,construction survey 1992/94 RINA - L. Register
Silver Wind Passenger Cruise V-Ship

Explorer Passenger Cruise V-Ship Refurbishing
Albatros Passenger Cruise V-Ship Res. MSC.24(60) Solas upgrading
Royal Star Passenger Cruise V-Ship  

N/t Gallura Ro-Ro Ferrovie dello Stato Crew accommodation Arrang.
Res. MSC.24(60) Solas upgrading

Saga Perl-Explorer II Passenger Cruise Saga-Ex.Shipping Co. Complete ship re-design: Basic design steelworks andpipeworks drawings and shopdocumentation electrical andventilation system, fire protectionconstruction, survey1994/1996 RINA - L. Register

Taurus Fast Ferry Tirrenia Complete aluminiumsuperstructure design: G.A., shop drawing nestling
1998 RINA – ABS
Aries Ro-Ro Fincantieri  

Seven Seas Navigator Passenger Vessel Radisson Complete ship re-design:
Basic design steelworks andpipeworks drawings and shopdocumentation electrical andventilation system, fire protectionconstruction, survey1998/1999 RINA

Seven Seas Voyager Passenger Vessel Radisson Complete ship design:
Basic design steelworks andpipeworks drawings and shopdocumentation electrical andventilation system, fire protectionconstruction, survey2000-2002 RINA??

Costa Classica Passenger Vessel Costa Crociere Res. MSC.24(60) Solas upgrading
Costa Romantica Passenger Vessel Costa Crociere

Costa Atlantica Passenger Vessel Costa Crociere Solas amendments
Costa Victoria Passenger Vessel Costa Crociere

Silver Shadow Passenger Vessel Silver Sea L.t.d. Complete ship design:
Basic design steelworks and pipeworks drawings and shop documentation electrical and ventilation system, fire protection construction, survey1998/2000 RINA
Silver Whisper    
Minerva II    

Ferula Crewboat Società Investimenti Armatoriali Complete ship re-design:
Basic design steelworks and pipeworks drawings and shopdocumentation electrical andventilation system, fire protectionconstruction, survey1998 RINA

Golfo dei Fiori trailer Ferry Marsano Group Lenghetened and new lift and ramps new stability1988 RINA

Golfo dei Poeti trailer/P.Ferry Marsano Group Lenghetened, new stability and management of project
Dal 1976 al 1988 RINA
Solas Conference updates
Res. MSC.24(60) Solas upgrading
Golfo degli Ulivi trailer/P.Ferry Marsano Group

Isola delle Perle trailer Ferry Marsano Group Conversion in passenger RO-RO vessel, new sub-division and stability
1987 RINA
Solas Conference updates
Res. MSC.24(60) Solas upgrading
Isola delle Stelle trailer Ferry Marsano Group

Golfo del Sole trailer/P.Ferry Marsano Group Lenghtened and new stability
1983 RINA
Solas Conference updates
Res. MSC.24(60) Solas upgrading

Toscana trailer/Cont.Pass.Ferry Tirrenia

Complete ship design:
Basic design steelworks and pipeworks drawings and shop documentation electrical and ventilation system, fire protection construction, survey1991 RINA


Capo Passero Passenger Ferry Tirrenia Modification of body plan and sub-division for new stability1983 RINA
Capo Spartivento Passenger Ferry Tirrenia
Capo Miseno Passenger Ferry Tirrenia
Arborea Passenger Ferry Tirrenia
Torres Passenger Ferry Tirrenia

Vincenzo Florio Passenger Ferry Tirrenia Complete ship design:
Basic design and shopdocumentation pipeworks drawings and shop documentation electrical and ventilation system, fire protection,construction, survey1996/1998 RINA - ABS
Cesare Rubattino 1200 pax Tirrenia

Italia Prima Cruise Vessel Nina Complete ship re-design:
Basic design steelworks and pipeworks drawings and shop documentation electrical and ventilation system, fire protection,construction, survey1990 RINA - ABS

Fast Ferry 111 Passenger Ferry Confidential Main study with first approval by Owner 1994

Refer 2000 Reef/P.Ferry Confidential Main study 1994
Fast Adriatic Ferry Reef/P.Ferry Confidential
Ro-Ro Marsano trailer/P.Ferry Marsano Group

Dana Gloria Ro-Ro Ferry DFDS Main study - basic design and total surveyor service- Owner rapresentative
1999-2002 ABS- RINA
Dana Sirena trailers&Passenger  

Serafino Ferruzzi Tanker Fermar Main conversion in tanker
Serafina Ferruzzi Tanker Fermar complete design: basic design
Gertrude Ferruzzi Tanker Fermar steelworks and pipeworks
Diletta Ferruzzi Tanker Fermar drawings and shop documentation electrical system, fire protection, construction, survey1987/88 RINA??

Ascot Tanker Ravano Cargo and ballast piping loading conditions 1988 L.Register

Giulia Berlingeri Chemical T. Berlingeri Loading plan, piping stability booklet 1987 RINA - B.Veritas - L.Register

Bulkerice Bulk Carrier Bulkitalia Bulk carrier condition and arrangement
1987 RINA- G.L.

Siba Aprica Cattle Carrier Siba Main conversion all drawings1984 RINA

Costa Europa Ex Westerdam Passenger Vessel Costa Crociere

Refurbishing 2002
Res. MSC. 24 (60) Solas upgrading
Porta State Control Assistance


Four Bay Oil Tankers Premuda Tankers SpA Structural modification in lower stool
Mooring Arrangement
Gas detection system diagram
training manualMaintenance ManualFire training & Fire safety bookletBallast water management
Four Island Oil Tankers  
Framura Oil Tankers  
Four Spring Oil Tankers  

Four Brig Oil Tankers Premuda Tankers SpA training manual
Four Clipper Oil Tankers Fire training & Fire safety booklet  
Four Ketch Oil Tankers Ballast water management  

Four Etoiles Oil Tankers Premuda Tankers SpA training manual
Fire training & Fire safety booklet
Ballast water management
Load master software on board
Fire and foam system diagram

Four Star Oil Tankers Premuda Tankers SpA Load master software on board
Ballast water management
Four Stern Oil Tankers    
Four Lochs Oil Tankers    
Four Glens Oil Tankers    
Four Seas Bulk Carries    
Four Tides Bulk Carries    

Four Coal Oil Tankers Premuda Tankers SpA Bilge and fire system diagram
Ballast water management
Four Moon Oil Tankers    

Four Iron Bulk Carrier Premuda Tankers SpA Ballast water management
training manual
Fire training & Fire safety booklet
Maintenance Manual
Four Euro Bulk Carrier  
Four Sterling Bulk Carrier  

Sciré Sailing Pleasure Yacht Private Owner Whole Construction

Camida Sailing Pleasure Yacht Private Owner Inside Refitting

Perini 87 mt. Sailing Pleasure Yacht   Basic Design

Perini 35 mt. Sailing Pleasure Yacht   Structure/Superstructure Design

Perini 54 mt. Sailing Pleasure Yacht   Complete ship design

Fishing Vessel 24 mt.     Basic Design

Tempest Pleasure Motor Yacht Private Owner Complete RefittingSuperstructure Design

Dionea Pleasure Motor Yacht Private Owner 2003 Complete Refurbiscing

Charter 184' Pleasure Motor Yacht Private Owner Basic Design

IAL-000 6mt Lifesaving Motorboat Vigili del Fuoco Basic Design

Mar-y005 Luxury Motor Yacht 139.5 m Private Owner Basic design

Sea Force One Luxury Motor Yacht 54.0 m Private Owner Complete ship design

Seabourn Odissey Passengers vessel Carnival Complete ship design
Seabourn Sojourn  
Seabourn Quest

 

In the last 7 years we have worked for Fincantieri 30.000 hours for developing steel working drawings and electrical design.


Silver Cloud hull towing (3500 tons) from Donada to Genoa

Silver Wind hull towing (3500 tons) from Donada to Genoa

Russian Hull Towing (4000 tons) from Ukraine to Genoa

Russian Hull Towing (9000 tons) from Saint Petersbourgh to Genoa

Super Floating Concrete Dry Dock 100.000 tons lift capacity:
Dynamical and statical wave loads to allow towing.


Silver Shadow/Whisper (5800 tons) from Donada to Genoa.
Official documentation for lifting calculation for about 3000 t steel blocks.

Seven Seas Voyager hull towing (7800 tons) from Donada to Genoa.
Official documentation for lifting calculation for about 2300 t steel blocks.

Seabourn Odissey-Sojourn-Quest hull towing (10200 tons) from S.G. Nogaro to Genoa.
Official documentation for lifting calculation for about 2600 t steel blocks.