| Ship Name |
Ship Type |
Owner |
Description of works, Date &
Register |
|
| Repubblica di Pisa |
Car Carrier |
Grimaldi Group |
Classification Project and lenghtning in cylindric
part
1988/89 RINA - ABS |
| Repubblica di Venezia |
Car Carrier |
Grimaldi Group |
| Repubblica di Genova |
Car Carrier |
Grimaldi Group |
| Repubblica di Amalfi |
Car Carrier |
Grimaldi Group |
| Repubblica di Roma |
Car Carrier |
Grimaldi Group |
|
| Ausonia |
Passenger Cruise |
Grimaldi Group |
Refitting in hotel and new bulb and new blades 1985 RINA Res.
MSC.24(60) Solas upgrading |
|
| Splendid |
Passenger Ferry |
Grimaldi Group |
First body plan andmanagement of project 1989
RINA - ABS |
| Majestic |
Passenger Ferry |
Grimaldi Group |
|
| Fides |
Car Carrier |
Grimaldi Group |
First body plan andmanagement and survejor of
project 1990 RINA - ABS |
| Spes |
Car Carrier |
Grimaldi Group |
|
| Repubblica Argentina |
Ro-Ro Cargo |
Grimaldi Group |
3D Model steel structure and classification drawings
1998 RINA - ABS Final stability |
| Repubblica del Brasile |
Fincantieri |
Grimaldi Group |
|
| Victory |
Ro-Ro Passenger Ferry |
Grimaldi Group |
Superstructure modifications
Solas Conference updates
Res. MSC.24(60) Solas upgrading
Refurbishing 2002 |
|
| Dora Baltea |
Car Carrier |
Grimaldi Group |
Antiracking calculationand works. 1987 RINA |
| Dora Riparia |
Car Carrier |
Grimaldi Group |
| |
|
| Costa Marina |
Passenger Cruise |
Costa Crociere |
Complete ship design:basic design steeelworks
and pipeworks drawings and shop documentation electrical and
ventilation system, fire protection
construction survey
1988 RINA – ABS |
| Costa Allegra |
Passenger Cruise |
Costa Crociere |
|
| Enrico Costa |
Passenger Cruise |
Costa Crociere |
New Stability. 1989 RINA |
|
| Costa Riviera |
Passenger Cruise |
Costa Crociere |
Refurbishing
Res. MSC.24(60) Solas upgrading |
| Costa Playa |
Passenger Cruise |
Costa Crociere |
|
| Switzerland |
Passenger Cruise |
Prestige |
Refurbishing
Res. MSC.24(60) Solas upgrading |
|
| Adriana |
Passenger Cruise |
Prestige |
New Stability
Refurbishing
Res. MSC.24(60) Solas upgrading |
|
| Mermoz |
Passenger Cruise |
Costa Crociere |
New Stability
1994 Bureau Veritas |
|
| Silver Cloud |
Passenger Cruise |
V-Ship |
Complete ship design:Basic design steelworks and
pipeworks drawings and shop documentation electrical and ventilation
system,construction survey 1992/94 RINA - L. Register |
| Silver Wind |
Passenger Cruise |
V-Ship |
|
| Explorer |
Passenger Cruise |
V-Ship |
Refurbishing |
| Albatros |
Passenger Cruise |
V-Ship |
Res. MSC.24(60) Solas upgrading |
| Royal Star |
Passenger Cruise |
V-Ship |
|
|
| N/t Gallura |
Ro-Ro |
Ferrovie dello Stato |
Crew accommodation Arrang.
Res. MSC.24(60) Solas upgrading |
|
| Saga Perl-Explorer II |
Passenger Cruise |
Saga-Ex.Shipping Co. |
Complete ship re-design: Basic design steelworks andpipeworks
drawings and shopdocumentation electrical andventilation system,
fire protectionconstruction, survey1994/1996 RINA - L. Register |
|
| Taurus |
Fast Ferry |
Tirrenia |
Complete aluminiumsuperstructure design: G.A., shop drawing
nestling
1998 RINA – ABS |
| Aries |
Ro-Ro |
Fincantieri |
|
|
| Seven Seas Navigator |
Passenger Vessel |
Radisson |
Complete ship re-design:
Basic design steelworks andpipeworks drawings and shopdocumentation
electrical andventilation system, fire protectionconstruction,
survey1998/1999 RINA |
|
| Seven Seas Voyager |
Passenger Vessel |
Radisson |
Complete ship design:
Basic design steelworks andpipeworks drawings and shopdocumentation
electrical andventilation system, fire protectionconstruction,
survey2000-2002 RINA?? |
|
| Costa Classica |
Passenger Vessel |
Costa Crociere |
Res. MSC.24(60) Solas upgrading |
| Costa Romantica |
Passenger Vessel |
Costa Crociere |
|
| Costa Atlantica |
Passenger Vessel |
Costa Crociere |
Solas amendments |
| Costa Victoria |
Passenger Vessel |
Costa Crociere |
|
| Silver Shadow |
Passenger Vessel |
Silver Sea L.t.d. |
Complete ship design:
Basic design steelworks and pipeworks drawings and shop documentation
electrical and ventilation system, fire protection construction,
survey1998/2000 RINA |
| Silver Whisper |
|
|
| Minerva II |
|
|
|
| Ferula |
Crewboat |
Società Investimenti Armatoriali |
Complete ship re-design:
Basic design steelworks and pipeworks drawings and shopdocumentation
electrical andventilation system, fire protectionconstruction,
survey1998 RINA |
|
| Golfo dei Fiori |
trailer Ferry |
Marsano Group |
Lenghetened and new lift and ramps new stability1988 RINA |
|
| Golfo dei Poeti |
trailer/P.Ferry |
Marsano Group |
Lenghetened, new stability and management of project
Dal 1976 al 1988 RINA
Solas Conference updates
Res. MSC.24(60) Solas upgrading |
| Golfo degli Ulivi |
trailer/P.Ferry |
Marsano Group |
|
| Isola delle Perle |
trailer Ferry |
Marsano Group |
Conversion in passenger RO-RO vessel, new sub-division
and stability
1987 RINA
Solas Conference updates
Res. MSC.24(60) Solas upgrading |
| Isola delle Stelle |
trailer Ferry |
Marsano Group |
|
| Golfo del Sole |
trailer/P.Ferry |
Marsano Group |
Lenghtened and new stability
1983 RINA
Solas Conference updates
Res. MSC.24(60) Solas upgrading |
|
| Toscana |
trailer/Cont.Pass.Ferry |
Tirrenia |
Complete ship design:
Basic design steelworks and pipeworks drawings and shop documentation
electrical and ventilation system, fire protection construction,
survey1991 RINA |
|
| Capo Passero |
Passenger Ferry |
Tirrenia |
Modification of body plan and sub-division for
new stability1983 RINA |
| Capo Spartivento |
Passenger Ferry |
Tirrenia |
| Capo Miseno |
Passenger Ferry |
Tirrenia |
| Arborea |
Passenger Ferry |
Tirrenia |
| Torres |
Passenger Ferry |
Tirrenia |
|
| Vincenzo Florio |
Passenger Ferry |
Tirrenia |
Complete ship design:
Basic design and shopdocumentation pipeworks drawings and shop
documentation electrical and ventilation system, fire protection,construction,
survey1996/1998 RINA - ABS |
| Cesare Rubattino |
1200 pax |
Tirrenia |
|
| Italia Prima |
Cruise Vessel |
Nina |
Complete ship re-design:
Basic design steelworks and pipeworks drawings and shop documentation
electrical and ventilation system, fire protection,construction,
survey1990 RINA - ABS |
|
| Fast Ferry 111 |
Passenger Ferry |
Confidential |
Main study with first approval by Owner 1994 |
|
| Refer 2000 |
Reef/P.Ferry |
Confidential |
Main study 1994 |
| Fast Adriatic Ferry |
Reef/P.Ferry |
Confidential |
| Ro-Ro Marsano |
trailer/P.Ferry |
Marsano Group |
|
| Dana Gloria |
Ro-Ro Ferry |
DFDS |
Main study - basic design and total surveyor service-
Owner rapresentative
1999-2002 ABS- RINA |
| Dana Sirena |
trailers&Passenger |
|
|
| Serafino Ferruzzi |
Tanker |
Fermar |
Main conversion in tanker |
| Serafina Ferruzzi |
Tanker |
Fermar |
complete design: basic design |
| Gertrude Ferruzzi |
Tanker |
Fermar |
steelworks and pipeworks |
| Diletta Ferruzzi |
Tanker |
Fermar |
drawings and shop documentation electrical system, fire protection,
construction, survey1987/88 RINA?? |
|
| Ascot |
Tanker |
Ravano |
Cargo and ballast piping loading conditions 1988 L.Register |
|
| Giulia Berlingeri |
Chemical |
T. Berlingeri |
Loading plan, piping stability booklet 1987 RINA - B.Veritas
- L.Register |
|
| Bulkerice |
Bulk Carrier |
Bulkitalia |
Bulk carrier condition and arrangement
1987 RINA- G.L. |
|
| Siba Aprica |
Cattle Carrier |
Siba |
Main conversion all drawings1984 RINA |
|
| Costa Europa Ex Westerdam |
Passenger Vessel |
Costa Crociere |
Refurbishing 2002
Res. MSC. 24 (60) Solas upgrading
Porta State Control Assistance |
|
| Four Bay |
Oil Tankers |
Premuda Tankers SpA |
Structural modification in lower stool
Mooring Arrangement
Gas detection system diagram
training manualMaintenance ManualFire training & Fire safety
bookletBallast water management |
| Four Island |
Oil Tankers |
|
| Framura |
Oil Tankers |
|
| Four Spring |
Oil Tankers |
|
|
| Four Brig |
Oil Tankers |
Premuda Tankers SpA |
training manual |
| Four Clipper |
Oil Tankers |
Fire training & Fire safety booklet |
|
| Four Ketch |
Oil Tankers |
Ballast water management |
|
|
| Four Etoiles |
Oil Tankers |
Premuda Tankers SpA |
training manual
Fire training & Fire safety booklet
Ballast water management
Load master software on board
Fire and foam system diagram |
|
| Four Star |
Oil Tankers |
Premuda Tankers SpA |
Load master software on board
Ballast water management |
| Four Stern |
Oil Tankers |
|
|
| Four Lochs |
Oil Tankers |
|
|
| Four Glens |
Oil Tankers |
|
|
| Four Seas |
Bulk Carries |
|
|
| Four Tides |
Bulk Carries |
|
|
|
| Four Coal |
Oil Tankers |
Premuda Tankers SpA |
Bilge and fire system diagram
Ballast water management |
| Four Moon |
Oil Tankers |
|
|
|
| Four Iron |
Bulk Carrier |
Premuda Tankers SpA |
Ballast water management
training manual
Fire training & Fire safety booklet
Maintenance Manual |
| Four Euro |
Bulk Carrier |
|
| Four Sterling |
Bulk Carrier |
|
|
| Sciré |
Sailing Pleasure Yacht |
Private Owner |
Whole Construction |
|
| Camida |
Sailing Pleasure Yacht |
Private Owner |
Inside Refitting |
|
| Perini 87 mt. |
Sailing Pleasure Yacht |
|
Basic Design |
|
| Perini 35 mt. |
Sailing Pleasure Yacht |
|
Structure/Superstructure Design |
|
| Perini 54 mt. |
Sailing Pleasure Yacht |
|
Complete ship design |
|
| Fishing Vessel 24 mt. |
|
|
Basic Design |
|
| Tempest |
Pleasure Motor Yacht |
Private Owner |
Complete RefittingSuperstructure Design |
|
| Dionea |
Pleasure Motor Yacht |
Private Owner |
2003 Complete Refurbiscing |
|
| Charter 184' |
Pleasure Motor Yacht |
Private Owner |
Basic Design |
|
| IAL-000 6mt |
Lifesaving Motorboat |
Vigili del Fuoco |
Basic Design |
|
| Mar-y005 |
Luxury Motor Yacht 139.5 m |
Private Owner |
Basic design |
|
| Sea Force One |
Luxury Motor Yacht 54.0 m |
Private Owner |
Complete ship design |
|
| Seabourn Odissey |
Passengers vessel |
Carnival |
Complete ship design |
| Seabourn Sojourn |
|
| Seabourn Quest |
|
|
In the last 7 years we have worked for Fincantieri 30.000 hours
for developing steel working drawings and electrical design.
Seven Seas Voyager hull towing (7800 tons) from Donada to Genoa.
Official documentation for lifting calculation for about 2300 t
steel blocks.
Seabourn Odissey-Sojourn-Quest hull towing (10200 tons) from S.G. Nogaro to Genoa.
Official documentation for lifting calculation for about 2600 t steel blocks.